Trimble
PDF Export RSS - Latest News


Version 19.00

Updates in Novapoint Bridge

To be able to run Novapoint Bridge in version 19.00 you must first make a Bridge task in the Novapoint Basis modelling ribbon. You connect the bridge geometry to the actual road model in the Bridge task. In the Bridge task you can choose whether you want to connect an existing bridge geometry file (kbg-file) to the road model or make a new bridge geometry.

When you have made the Bridge task, then you must open AutoCAD and go to the Bridge set-up dialog where you choose the actual Bridge task. When this is done you can work as before in Novapoint Bridge.

Last modified: 2012/10/22 06:09 by vn_no_jeh
CC Attribution-NoDerivs 3.0 Unported License.