Novapoint 20.0x.FP6d

If you use Trimble Quadri, this version can only be used with Trimble Quadri 2.0 or newer.

If you use named login (Vianova ID) with Novapoint 20.05, then make sure you have Novapoint 20.05.fp6d

Models created with earlier versions of Novapoint, will be converted on opening in NP20.00 and can ONLY be used in NP20.00, and it will not be possible to open it with earlier versions of Novapoint after conversion.

Using Novapoint 20.05 with floating license (FLEXlm license manager) will require license manager 11.14 of FLEXlm. Make sure the license manager support this before you try to use Novapoint 20.05. If your network uses the IPv6 protocol (as used in Microsoft Direct Access), you should set the FNP_IP_PRIORITY=6 environment variable on the client computer to give priority to IPv6, which can improve performance and avoid unwanted IPv4 address resolution.

Novapoint 20.00 and Novapoint 20.05 will both require license version 20.00.

Login using named user (Vianova ID) will work for both Novapoint 20.00 and Novapoint 20.05.

There are some issues using the USB hardware lock (FLEXid). Please contact us if you want to use Novapoint 20.05 with the USB lock.

 
 

Updates in Novapoint Road

Alignment Design

FIXED: An error introduced with NP20.FP6b where the alignment picked in drawing was not deleted when it was picked through Alignment Designs “Pick object”.

Cross-section Viewer

FIXED: Illustration objects with symbols in the cross-section is back.

Draw Cross-sections

IMPROVED: Illustration objects in the road model is drawn out with PLOT active so that these are also visible when drawing to PDF.

 
 
 
 

Updates in Novapoint Railway

(Here we list the updates that are in addition to updates for Novapoint Road.)

Build Railway model

FIXED: Widtherror on railway surfaces for double track in transitions for clothides on the centerline.

The fix is reverted in FP6e as i caused other issues.
 
 
 

Updates in Novapoint Tunnel

FIXED: 3D-drawing failed for some situations. This is now corrected.

FIXED: Rock support registered at the ends of the tunnel was not shown. This in now corrected.

FIXED: LandXML files from Bever Team e.g. had a different order of the profile curve end points and centre points compared to the LandXML standard. Novapoint Tunnel can now import these files too.

FIXED: User defined values in the scanner data dialog were not saved. This is now corrected.

FIXED: For some situations, the calculated from and to values of the triangulated scanner data were not correct. This is now corrected.

FIXED: CC for spilingbolts was not saved. This is now corrected*/

 

Updates in Novapoint Water and Sewer

Cross Section Build

* FIXED: Build error caused by missing trench section vertical geometry. * After updating FP6d open the design dialogue and save click Save or OK to fix the geometry. Start the WS build dialogue and build Trench(es). Now the build should work without error.

 
 
 
 
 
 
 
 
 
 