Trimble
PDF Export RSS - Latest News


Tunnel Project Settings

MOUS_ICO Menu: Tunnel > Tunnel Project Settings…
MOUS_ICO Toolbar: Tunnel: Tunnel Project Settings…

This is the dialog where set up your tunnel project. Most of the functionality in Novapoint Tunnel uses the project information you specify in this dialog.

The tunnel project file holds the information of which tunnel geometry file that should be used together with a road project and a terrain model.

This dialog doesnít read the project setup from the general project ID in Novapoint, so you have to set up your project from scratch in this dialog.

The following tool-buttons are available in this dialog:

  • Create a new tunnel project file or tunnel geometry file.
  • Open an existing tunnel project file, tunnel geometry file, road project file or terrain model file
  • Save the tunnel project file
  • Delete the tunnel geometry file from the tunnel geometry file dropdown list in this dialog.

You should make sure that the road- and terrain models specified in the Novapoint Project ID dialog are identical to the road- and terrain models specified in this dialog. The system does not set up this automatically.

Last modified: 2011/02/10 03:35 by ba_vn_htl
CC Attribution-NoDerivs 3.0 Unported License.