Trimble
PDF Export RSS - Latest News


Version 19.20 FP5b

Updates in Novapoint Water and Sewer

WS/Cable task in Base

* Fixed: When creating a new trench (in WS construction ACAD) a summary task in Base was created with the same name as the originally WS task, and added under a summary task. This is now fixed so that new trench is added to the active WS main task.

Cross section calculation

* Fixed: When the trench wall soil and rock slopes are unequal, and the trench is in soil and rock the calculated cross sections gave wrong trench width.

en/np/water_sewer/release_notes/np1920fp5b/start.txt · Last modified: 2015/01/29 17:06 by vn_no_int